Ridgeline Rural Broadband
Middle-mile backbone plus four distribution laterals reaching 4,180 previously unserved passings. Make-ready on 2,600 poles ran concurrently with underground construction on the two laterals that had no pole line to use.
Seven jobs that show how the divisions work together. Owner names are withheld where the agreement requires it; the numbers are not.
01 Index
| Ref | Project | Division | Owner | Scope | Duration | Result |
|---|---|---|---|---|---|---|
| P-0118 | Ridgeline Rural Broadband | Broadband | Regional electric cooperative | 118 route mi | 19 mo | 5 wk ahead of milestone |
| P-0142 | Caldwell River Crossing | Gas & HDD | Gas transmission operator | 1,340 LF HDD, 12" steel | 11 wk | Zero inadvertent returns |
| P-0127 | Harbor District Undergrounding | Power | Investor-owned utility | 9.2 circuit mi | 26 mo | No daytime interruptions |
| P-0163 | Millbrook Water Main Replacement | Water | Municipal water authority | 11,600 LF 12" DI | 8 mo | All testing passed first submittal |
| P-0155 | Hurricane Mutual Aid, Gulf Coast | Storm | Host utility, mutual aid | 12 crews, 6 feeders | 9 d | Zero recordables |
| P-0171 | North Basin I&I Reduction | Wastewater | Regional sewer district | 18,400 LF CIPP | 14 mo | 41% inflow reduction |
| P-0191 | Cedar Flats Campus, Phase 1 | Hyperscale | Hyperscale developer, via EPC | 34.5kV duct bank, 62 MH | 13 mo | Energization milestone held |
02 Profiles
Middle-mile backbone plus four distribution laterals reaching 4,180 previously unserved passings. Make-ready on 2,600 poles ran concurrently with underground construction on the two laterals that had no pole line to use.
Single-pass directional drill of 12-inch steel transmission beneath a navigable river and an active rail spur. Full-time turbidity monitoring, a staged frac-out response on both banks, and a pullback executed inside one 14-hour window.
Overhead-to-underground conversion through a downtown business district. Duct bank and vaults installed by day under lane closures, services cut over block by block between 11 p.m. and 5 a.m. so no storefront lost a business hour.
Replacement of failing cast iron main under a residential grid with 340 service transfers. Bored under mature street trees rather than open cutting, which saved the canopy and most of the neighborhood's patience.
Twelve crews on the road within nine hours of the request, self-sufficient for the first seventy-two. Assigned six feeders, cleared and rebuilt them in nine days, and demobilized without a single recordable injury.
Flow monitoring, smoke testing, and CCTV across a 40-year-old collection basin, then targeted rehabilitation: 18,400 feet of CIPP lining, 96 manholes coated, and 210 laterals sealed — ranked by gallons removed per dollar.
Campus underground for a 96 MW build. Medium-voltage duct bank from the utility service entrance to two switchgear pads, generator yard feeders and double-wall fuel, and two physically diverse carrier entrances to the meet-me room. Duct bank was surveyed open and closed out four days ahead of the cable pull release, which is the only date on that job anyone actually cares about.
03 Portfolio
04 Next step
Send the corridor, the scope, and the in-service date. We will tell you what it really takes — including the parts other bidders leave out.